Image
Sitowise was responsible for the environmental engineering studies of the 18.4-hectare tailings area, the assessment of the need for remediation and the preparation of the general and construction plan for the restoration.
The Haveri mine area has an 18.7-hectare tailings waste area, which contains approximately 1.4 million tonnes of tailings. The planned remediation solution included covering the 13.4 ha tailings area with poorly permeable soil and collecting and treating leachate discharged from ramps and surface water from uncovered areas.
- Subscriber :Pirkanmaa ELY Centre
- Date of implementation:2020-2021